Skip to content

Latest commit

 

History

History
67 lines (51 loc) · 5.22 KB

github-automation.md

File metadata and controls

67 lines (51 loc) · 5.22 KB

Project board and automation

← Design docs · Research: what we love · Event facts

WinCS – DEGDEV 3 follows THD Room Finder's board (its reference) and Voyager's workflow. Issues describe deliverables; PRs are the review queue. Epics, parked ideas and blocked work stay off the daily view. The rules for writing issues and PRs are in CONTRIBUTING.md; the jam-night loop is in 12 – Team workflow. Set up on 23 October 2026.

Views

View Layout Filter Purpose
Open work Board, Status columns; Priority ascending is:issue is:open -label:"type:epic" -label:parked -status:Blocked What the team can pick up now
Art review Table is:issue label:"area:art" Sprite sheets and plates with their Design review
Milestones Table is:issue label:"type:epic" is:open The six epics and their sub-issue progress
Waiting Table, grouped by Milestone is:issue is:open status:Backlog,Blocked -label:"type:epic" Work waiting on another issue or on someone outside the team
Pull requests Table, grouped by Status is:pr is:open Review and merge queue
Completed Table, newest Updated first is:closed Closed issues and PRs. Closed as not planned is not shipped

Fields

Field Meaning
Status Backlog (waits on another issue) · Ready (start now) · In progress · In review · Blocked (waits outside the team) · Done (merged and live)
Priority P0 the slice fails without it, never cut · P1 needed · P2 first to cut (cut order)
Size XS < 30 min · S ≈ 1 h · M 2–3 h · L 4+ h, split if you can · XL split it
Design review Art only: Approved · Changes needed · Not started. Alexander's decision, separate from PR review
Start date First observed In progress or In review; set once
Target date Only a real deadline. Milestones carry the jam deadlines
Completed date Issue closure or PR merge date
Milestone, Labels, Assignees, Parent issue, Sub-issues progress, Linked pull requests, Reviewers Native GitHub data

Ready vs Backlog is the jam's one deviation from Room Finder: with 60 issues and one night, Ready has to mean "you can start this right now". Dependencies are native blocked by relationships on each issue; when the last blocker closes, whoever closed it moves the waiting cards to Ready.

Automation

Trigger Result Mechanism
Open issue or PR in THD-AI/WinCS Added to the board Native auto-add: is:issue,pr is:open
Sub-issue added Added to the board Native auto-add sub-issues
Item added Backlog Native workflow
PR linked to an issue In progress Native workflow
Changes requested / approved In progress / In review Native workflows
Issue closed / PR merged Done Native workflows
Issue reopened Ready Native workflow
Card moved to Done Does not close the issue Auto-close disabled
Draft / ready PR In progress / In review, for the PR and its Closes issue project-sync.yml
PR closed without merge PR Backlog; its issue Ready, only if no other open PR closes it project-sync.yml
First active state / closure Start / Completed date project-sync.yml
Daily, or run by hand Repair missed transitions and dates project-sync.yml
PR opened or edited Conventional title (an optional [n/N] stack prefix allowed), a linked issue, author assigned, area:* labels from paths pr-conventions.yml
/take, /drop on an issue Assign / unassign the commenter, reply with a branch name issue-commands.yml
Last sub-issue closed Epic gets ready-for-acceptance and a comment; it is never closed automatically sub-issue-rollup.yml

A merge into a stacked branch never completes an issue; only the merge into main does. Refs #n never claims or moves a task.

Credentials

project-sync.yml needs a repository secret PROJECTS_TOKEN: a fine-grained personal access token with access to the THD-AI organisation, Projects: read and write, plus Issues and Pull requests: read on THD-AI/WinCS. The workflow checks out only main, never runs code from a PR with that token, and fails visibly when the secret is missing or expired. The other three workflows use the built-in GITHUB_TOKEN. Alexander owns the token and its expiry (set it to expire after the jam).

gh secret set PROJECTS_TOKEN -R THD-AI/WinCS

Repository settings

Merge commits only (squash and rebase off), automatic branch deletion off so stacked PRs keep their base branches, Discussions on for ideas.

← Design docs · Research: what we love · Event facts