Synthetic, authored example of intended output, not an executed agent evaluation. These fictional source notes are included here so every item can link to evidence; in a real project, link to the existing documents and results instead.

Source: goal and decisions

The owner wants a pilot CSV export that preserves id,value columns and handles empty input. Completion requires both checks to pass. Five automatic retries are proposed but have not been approved or implemented.

Source: checks and open work

The CSV columns check passed on fictional October 1. Empty-input testing has not run: a representative synthetic input is missing. Next, prepare that input and run the check. Configuration and test results do not establish deployment.

Source: retained attempt notes

Fictional September 29: an attempt failed because the input path was wrong; the failure identified the required path, which is useful learning. September 30 and October 1: attempts used the corrected path but still lacked the representative input. Neither recorded a new result or useful finding. These supplied notes cover only these attempts, not all project activity.

Example Markdown view

Snapshot of the fictional October 1 evidence above; not live agent activity.

Goal: deliver the pilot CSV export with both completion checks passing. Goal and completion conditions.

Pilot CSV export [G]                       GOAL INCOMPLETE
|
|-- DONE     CSV columns check [C]
|
`-- BLOCKED  Empty-input check [E]
    `-- NEEDS representative input [E]
        `-- NEXT prepare input, then run empty-input check [E]

Outside the completion path:
PROPOSED five retries [G] (not approved or implemented)

Sources for the visual:

The two checks are parallel completion conditions; neither is shown as a prerequisite for the other. The missing input blocks only the empty-input check. NEEDS marks that prerequisite; NEXT marks the action to take. Deployment remains unverified.

Meaningful advance: the first failed attempt established the correct input path. That narrowed the problem without completing empty-input handling. Retained attempt notes.

Possible stall: September 30–October 1 repeated the missing-input failure without a recorded new finding. These notes suggest revisiting the prerequisite; they do not prove a loop or rule out unrecorded work. Compared attempts.

Current focus and next action: prepare the missing synthetic input, then test empty-input handling. Open work.