Skip to content

O3.1.1 - Milestone 2a: Limit Increase Readiness #5384

Description

@anupsdf

Outcome

All required changes identified by the 200 SAC TPS readiness evaluation are implemented, released, and validated. Core, Platform, and Wallets either:

  • complete the changes needed to support the proposed network-limit increase;
  • confirm no changes are required because the system already passes evaluation;
  • or, document that only a partial limit increase is currently supportable.

By the end of this milestone, the network-limit proposal is ready for execution, including technical validation, SLP acceptance, SDF infrastructure readiness, and external communication.

Exit criteria

  • Required changes for Core, Platform, and Wallets are implemented and released in stable versions.
  • SDF infrastructure is updated to support the stable versions and proposed limits.
  • Teams that require no changes explicitly document a no-op/pass result.
  • Milestone 1.b evaluation is re-run using stable versions, not prototypes. Re-run confirms that required SLAs are met for the proposed network limits.
  • If full 200 SAC TPS support is not possible, the supported partial limit is documented with data. If no safe partial limit is feasible, blocking bottlenecks and required follow-up work are documented.
  • SLP is proposed, presented to the community, and accepted.
  • External communication is complete, including notifying Tier1 operators of the upcoming upgrade.
  • Rollout plan, monitoring plan, and rollback/kill-switch plan are reviewed and ready for Milestone 2.b.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions