Track completed-roadmap audit corrections, evidence gaps, and integration gates #132

Description

@flyingrobots

Completed-roadmap audit follow-up tracker

This is a tracking container, not an executable issue or an additional PR. It accounts for the 2026-09-30 audit's findings, prepared corrections, integration gates, and unfinished certification of the original 83 completed entries. Originally unfinished roadmap features are excluded.

Source: docs/audits/completed-roadmap-2026-09-30.md and original criteria in ROADMAP.md, currently on feature/roadmap-m4-tasks. Checklist entries mean the obligation is tracked, not that acceptance is satisfied. Close this container only when every original completed task has a criterion-by-criterion verdict and every required correction is integrated or explicitly remains blocked with truthful roadmap status.

New executable follow-ups

Reused issues

Integration and external gates

  • Retention recovery, crash-matrix evidence, reader fence, and model-based transitions (item 6) #99 is actually merged before T-18.1, T-18.2, T-19.1, and T-20.1 are declared done under their original definitions. Its existing 51-case retention matrix is evidence; the stale KEEP-RETENTION-006 ledger correction is prepared locally. This is integration tracking, not a second implementation PR.
  • Implement the Echo–Keep physical-content boundary echo#722 supplies actual adapter/cutover evidence for T-25.2. It is open, and production replacement was explicitly unapproved when checked. Keep cannot infer completion from the merged boundary document. Reuse the external owner; no duplicate Echo issue is created.
  • T-01.2/T-06.3/T-10.2/T-20.1/T-24.2/T-38.2/T-38.3 prepared local corrections retain issue → PR → mainline integration-commit traceability. Green local tests are not merge evidence.

Graph and coverage

The report-level corruption issue requires the durable report implementation. Beyond-single-segment scale evidence requires rollover. Other conditional prerequisites are spelled out in each issue with reasons. These are proposed dependency edges; this checklist alone does not record a GitHub blocking graph. Shared parents or files are not blockers.

Each executable outcome should land in one independently verifiable PR preserving a working target branch. Broader existing issues #20, #21, #82, and #108 retain original requirements and are coordinated with follow-ups rather than counted as duplicate implementation units. #131 owns complete accounting for the remaining 64 checked tasks; the first pass reopened 19 and did not certify the other 64.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions