docs(plans): refresh plan index and status for 0.50.0 - #274
sambitcreate wants to merge 2 commits into
Conversation
Move merged plans (context meter #187, chronological chat motion #224, draft agent chats #103, rich link previews #253, scoped MCP resources #230 and server instructions #229, trusted AGENTS refresh #232, durable chat PRs #184, durable tool output #219, skill/MCP session context #214 and its audit) into docs/plans/completed/ and list them as complete. Record merged status for Simulator Devices #252, Aiden CLI #121, Linux #71, Gemini read-aloud #245, durable Bot runs #243 and other active plans, update the Pi pin to 0.87.1, fix the stale rpiv-advisor link, and note merge status in the matching .memory files. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
There was a problem hiding this comment.
ℹ️ One plan-status inconsistency is worth correcting inline.
Reviewed changes I reviewed the plan index, completed-plan moves, active-plan status updates, and matching .memory/ notes in the initial PR commit.
- Completed plans Moved shipped plans into
docs/plans/completed/and updated their completion records. - Active plans Refreshed merge, release, and follow-up status in the index and corresponding plan files.
- Project memory Added dated status notes and adjusted a moved audit link.
GPT Luna | 𝕏
There was a problem hiding this comment.
✅ No new issues found.
Reviewed changes I re-reviewed the delta since the prior pullfrog review — the new commit 87d7fc8 ("docs(plans): reflect completed CLI phase six work"), which touches the plan index and one project-memory note.
- Index Phase 6 status: The Aiden CLI row now reads "Phases 0–6 implementation complete" and "Phase 6 delivered", matching
docs/plans/aiden-cli-plan.md, whose Phase 6 deliverables are all marked done and whose checkpoint keeps the plan active solely for the physical iPhone rerun. This resolves the prior inline comment. - Project memory:
.memory/aiden-cli-standalone.mdgains a dated note recording that the index now describes Phase 6 as implemented while physical iPhone acceptance stays pending.
GLM Flash | 𝕏
Hermes Review BotConfidence: 5 Engine: SummaryUpdates the plan index and status files for the 0.50.0 milestone in accordance with Confidence Score: 5/55/5 — All 31 touched files, 11 plan moves, 450 repository markdown links, commit hashes, version tags, and merge-tree dynamics against 📁 Important Files Changed
FindingsNo findings. 📊 Sequence DiagramUnchanged or not applicable for this change. Machine-Readable Findings[]
|
|
Superseded by #297, a fresh plans refresh against current main after 0.51.0. The branch is kept. |
* docs(plans): refresh plan index and status for 0.51.0 Supersedes #274. Moves 22 completed plans into docs/plans/completed/, refreshes active plan status against main after 0.51.0, records unlinked shipped changes (#265, #275, #280), and updates .memory notes. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> * docs(plans): note #220/#223 superseded and Steer moved to #298 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> * docs(plans): record desktop and Telegram Steer shipped in #298 Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com> --------- Co-authored-by: Claude Opus 5.5 <noreply@anthropic.com>

Summary
Docs-only housekeeping for 0.50.0.
docs/plans/README.mdstill listed several plans as "In review" or "PR CI pending" after their PRs merged, and still quoted Pi 0.84.4. I checked each PR withgh pr view/gh pr listand brought the index, the plan status lines and the matching.memory/notes up to date. No feature code changed.Source: plan-index maintenance rules in
AGENTS.mdanddocs/plans/README.md.What changed
Moved to
docs/plans/completed/(all merged; each status line now reads "Complete — merged in PR #N"):Remaining hands-on or physical-device acceptance items are noted in the completion notes. They are not listed as open plan scope.
Active plans, status updated in both the index and the plan doc:
completed/but the index pointed to the old path) and moved its row to Completed..memory/: added dated status notes to the context-meter, rich-link, MCP (advertised status, resources, instructions), trusted AGENTS, chat PRs, durable tool output and small-context budget files.mcp-advertised-status.mdnow links to the audit's new path.Links: a relative-link check over
docs/**,.memory/and the root docs finds no broken links from these moves. The only failures left are indocs/testing/integrated-upstream-audit-2026-09-12.md, which already had absolute/Users/.../.codex/worktrees/...links before this change. I left them alone.Tests run
git diff --check: cleandocs/**/*.md,.memory/*.md,README.mdandAGENTS.mdgit grep docs/plans/over code and CI files: the only references (form-fill-specialist-plan.mdandaiden-cli-plan.md) did not moveNo code or test suites were affected, so none were run.
Follow-ups
docs/testing/integrated-upstream-audit-2026-09-12.mdwith repo-relative links.🤖 Generated with Claude Code