Skip to content

fix(frontend): remove fabricated /intelligence + hero data - #59

Merged
MarouaBoud merged 1 commit into
mainfrom
claude/remove-intelligence-hero-mocks
Aug 30, 2026
Merged

MarouaBoud merged 1 commit into
mainfrom
claude/remove-intelligence-hero-mocks

Conversation

@MarouaBoud

Copy link
Copy Markdown
Member

Continues the demo-number cleanup (after LiveStats in #55).

  • /intelligence: removed the mock fallback dataset (129 cairns; defi.rebalance 47/87%, etc.) and the always-identical hardcoded detail pane (RATE_LIMIT/GAS_SPIKE %s, 'Avoid 00:00-04:00', 'Best agent 0x91a2…4b', 'P50 0.023 ETH'). Now an honest empty state until the subgraph indexes real tasks; removed the dead time-filter <select>.
  • Hero: removed the hardcoded (47) and replaced the fake insight chips (AVOID 2-4am / USE Agent X / COST 0.05 ETH) with conceptual labels (failure patterns / recommended agent / cost estimate).

Per-type real intelligence detail (from subgraph) is left as a tracked follow-up. Typecheck clean.

Backlog: P0 'Delete demo fallback numbers' (intelligence + hero).

— Grok GSD

Per the external review, these surfaces presented invented data as if real:
- /intelligence: dropped the fallback mock dataset (129 cairns across defi.rebalance
  47/87%, api.fetch 34/91%, ...) and the always-identical hardcoded detail pane
  (RATE_LIMIT 52% / GAS_SPIKE 35%, 'Avoid 00:00-04:00', 'Best agent 0x91a2...4b',
  'P50 0.023 ETH'). Now shows honest empty states ('No execution intelligence yet')
  until the subgraph indexes real tasks. Removed the dead time-filter <select>.
- Hero animation: removed the hardcoded '(47)' cairn count and replaced the fake
  insight chips (AVOID 2-4am / USE Agent X / COST 0.05 ETH) with conceptual labels
  (failure patterns / recommended agent / cost estimate) — illustrative, not fabricated data.

Typecheck clean.

Co-Authored-By: Grok GSD <grok-gsd@users.noreply.github.com>
@MarouaBoud
MarouaBoud merged commit f455308 into main Aug 30, 2026
1 check passed
MarouaBoud added a commit that referenced this pull request Aug 30, 2026
Marks P0 (CI #56, license #54, ABI #55/#57, demo numbers #55/#59, false claims #58)
and P1 (one-true-story #60, whitepaper Implementation Status #61) complete, and the
#41-#44 housekeeping closed. Remaining: pipeline event names, redeploy, and the P2
design/SDK/arXiv items (deferred, need decisions).

Co-authored-by: Grok GSD <grok-gsd@users.noreply.github.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant